Re-roofing and KR 18 Profile lamination was installed over 1” thick polyisocyanurate insulation, 33000 m2.
Katherin Plant Tlaxcala
13,300 m2 of supply and installation of EverGuard ® TPO Membrane of 45 mm thick, white color, mechanically anchored with NDL warranty.
Guadalajara Airport Waiting Room
Supply and installation of TPO Carlisle sure weld M2 membrane, 60 mils thick, white color, mechanically anchored over 4" of TOP, Rock DD mineral wool. 1300 m2.
Guadalajara Airport Customs
Re-roofed over RD-91.5 Installed insulation for leveling of valleys and waterproofing insulation and water-repellent insulation, with 45 mils TPO with 10 year warranty.
Supply and installation of daylighting system with prismatic domes of 5x6 ft, double layer of acrylic at 5% of the 4500m2 area.
Cold Room
Supply and installation of 60 mils thick GAF M2 type membrane, white color, fully adhered, over 5.3" thick polyiso.
The first layer, mechanically anchored and the second fully adhered, with NDL (No Dolar Limit) guarantee, 1300 m2.
Bus Terminal
Re-roofed over RD-91.5 and installed: Insulation for leveling of valleys and water-repellent insulation, with 45 mils TPO with 10 year warranty.